You need a surety partner who understands site conditions, someone who can appreciate your angle of attacking the work, and the edge your iron has over others whose cost structure differs from yours.
EC excavated and removed approximately 5,000 CY in karst geology for a proposed water quality basin. EC lined the basin with bentonite to prevent infiltration. Basin consisted of large precast structures, tideflex valves and rock excavation. In association with the basin, EC restored an existing spillway including the installation of Contech Articulated Concrete Block, a gabion basket retaining wall within the streambed and final site restoration and paving at the sanitary sewer pump station.
Contact Us to Learn More